WinSPC Administrator

WinSPC Administrator

Print
Length: 3 days

What will the attendee take away from this training?
An ability to setup all the WinSPC items (e.g. parts, users) on which other users depend
An understanding of the three data collection interfaces
An understanding of how to collect data manually and from an external data source
Skill in monitoring data in real time using Plant Monitor and managing violations
The knowledge required to query and report data in a variety of formats
Familiarity with control tests and triggers

Who should attend this training?
New users, individuals who will be the key contacts/administrators for WinSPC and any user of WinSPC who is interested in learning more about the software.

Prerequisites
  • Basic knowledge of SPC or the SPC Fundamentals class
  • Objectives of using WinSPC in your company

Outline


Day 1
Basics of WinSPC
  • Launching and logging in the software
  • Client-server character of WinSPC C/S

Setting up and creating:
  • Parts or processes
  • Variables and attributes
  • Tags
  • Blueprints
  • Collection plans

Collecting data
  • How to create and set up collection plans
  • Chart layout options
  • Manual data collection (i.e. using the keyboard)
  • Exercise I – Setup a part with variables, attribute, and tags.
    Setup a collection plan and start collecting data using the keyboard

Equation Builder
  • SPC charts for calculated variables
  • Types of calculations
    • Intra-characteristic
    • Inter-characteristic
    • Using tags in specifications
    • Conditional calculations
    • Table function
  • Exercise II – Draw an Xbar-R chart for the calculated variable


Day 2
Collecting data from external data sources
  • How to configure WinSPC to accept data from serial device, text file
  • What is Timed data collection?

Control Tests and Triggers
  • What are control tests and triggers?
  • Types of Control tests
    • Subgroup level
    • Sample level
  • Default and user defined control tests, triggers

Custom control tests
  • Creating Custom control tests
    • Subgroup level
    • Sample level
  • Exercise III – Set up sample and subgroup level triggers for the part and test them in data collection

Plant Monitor – Real time monitoring tool
  • Design new layouts
  • Interpret layouts and determine the state of the process
  • What is the Automatic layout? How to use it?


Day 3
Short run processes
  • What are short run processes?
  • SPC charts for short run processes
  • Short run process in WinSPC

Analysis I – The Query Tool
  • How to filter data by date, time, users, machines, subgroups, tags
  • Query output and tools
  • Distribution Analyzer
    • Check the type of distribution the query data follows
    • Histograms, probability plots for the query data

Print Reports – Reporting Tool
  • Report types for parts, variables, attributes
  • How to create reports and setup cover pages
  • Exercise IV
    • Create a report and design the cover page
    • Preview the report

The Navigator Setup
  • How to activate buttons on the navigator screen
  • Attach useful documents/pictures to these buttons

Organization, Administration and Tools
  • WinSPC email system
  • Setting, changing passwords
  • Moving and copying tree items
  • System and station settings
  • Create and manage users / user groups
  • Import/export data
  • License manager
  • Archive/Restore
  • Emergency Access Recovery
  • Add language

Introduction to Custom Web Reporter (CWR)
  • Launching CWR from WinSPC or as a stand alone product
  • CWR Windows
  • Macros and reports


>>Next:SPC Fundamentals
 
Visit us at Booth #727 for a demonstration of our latest WinSPC release.
 
eNewsletter
DataNat|eNews
All the latest industry news right to your inbox
privacy